Höpflerbad

Endresstraße 24-26, 1230 Wien, Austria

Role:
BIM - project control & project management
Client:
MA 44 Bäder
Planned completion:
2027
Status:
under construction
Architecture:
gobli GmbH
Project volume:
approx. 24 Mio. Euro


As part of the Vienna Swimming Pool Construction Program 2030, the Höpflerbad in Vienna-Liesing is being expanded to include a modern indoor swimming pool. The goal is to expand public swimming facilities in the 23rd district and make them accessible year-round.

A compact indoor pool with clear orientation and barrier-free access is being built on approximately 2,000 m² of gross floor space.

Specific features

  • A multi-purpose pool (25 x 16 m) with one- and three-meter diving boards
  • A teaching pool (13 x 9 m)
  • A toddler pool (5 x 3 m)
  • District heating, hybrid collectors, and heat pumps for energy supply
  • Green roofs and facades